In June, 2011, Jumbo Offshore’s DP2 heavy lift vessel Fairplayer is set to install four subsea protection structures for production flowlines at water depths of 600 m in the Laggan and Tormore fields, 125 km off the north-west of the Shetland islands. These fields,...
Posted on 4/27/2011 / 0
comments / Read More