
The modification is designed to increase capacity from a current of 35,000 cu m/d (1.24 MMcf/d) of water to 70,000 cu m/d (2.5 MMcf/d). In addition, a new power cable will be installed between Gullfaks B and the Gullfaks A platform.
[Read more]
Source: Penn Energy
0 comments:
Post a Comment