Image courtesy of Port Oostende |
At the REBO Terminal in Port Oostende, Belgium, two large cranes manufactured by Vigan Engineering were recently assembled and shipped to Benghazi, Libya, on October 13, 2025.
The operation was organized in coordination with Manora Logistics, with additional technical support from MultiTech and OSSCO NV. The project involved complex heavy-lift handling and transport, carried out entirely from the REBO Terminal’s facilities.