Mar 25, 2011
Guam drydock, “Machinist”, successfully refloated
RESOLVE Marine Group has successfully raised and refloated the “Machinist” drydock at Guam Shipyard in Apra Harbor, Guam. The 825 ft drydock sank on January 2, 2011 during a rough weather event. The salvage began on January 31 and successfully refloated the drydock on March 3.
[Read More]
Source: gCaptain
Category:
Shipbuilding
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment