Nov 23, 2010

Burleson Energy Limited First Heintschel Appraisal Well D.Truchard #1 Spudded



Burleson Energy Limited is pleased to advise that the D.Truchard #1 well, the first appraisal well on the broader Heintschel structure, has been spudded using the Big 6 drilling rig.
The D.Truchard #1 well is located some 2.9 km from the Heintschel #1 well location which lies within the main Colorado County Project 3D seismic area. The well will target Lower Wilcox reservoir sands and is expected to be drilled to a total depth of approximately 11,800 feet (3,850m). It is anticipated that the D.Truchard #1 well will take approximately 28 days to drill and complete.
The D.Truchard prospect is targeting a separate 300 acre closure within the broader 4,460 acre Heintschel structure and will test the subsurface correlation of Wilcox sands encountered in the Heintschel #1 well and mapped across the Heintschel closure based on 3D seismic data.
Source: Press release

0 comments:

Post a Comment

 
Copyright © 2011. Maritime Press Clipping . All Rights Reserved
Home | Company Info | Contact Us | Privacy policy | Term of use | Widget | Site map
Design by Herdiansyah . Published by Borneo Templates