Nov 23, 2010
Line 6B to resume operations by Wednesday, Enbridge oil pipeline shut down to check, repair anomalies
Enbridge Inc. said operations on its Line 6B oil pipeline in the U.S. will resume by mid-week after anomalies discovered on the line forced the energy giant to shut down operations last week. The weeklong closure of the 290,000 barrel per day line will be longer than expected by the market, and comes less than two months after the oil pipeline resumed operations following a spill into Michigan waterways.
[Read more]
Source: Calgary Herald
Category:
Offshore and Energy
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment