Nov 30, 2010

Lay System for Mcdermott International



A 300-tonne cable and pipe lay system will shortly be delivered to McDermott International Inc. The SURF (subsea umbilical riser and flowline) installation market is expanding and pushing into ever-deeper waters. At the same time IHC Engineering Business (IHC EB) has seen a dramatic expansion of its range of pipe and cable lay systems, with a number of large scale projects delivered, or ongoing.
[Read more]
Source: Hydro-International

0 comments:

Post a Comment

 
Copyright © 2011. Maritime Press Clipping . All Rights Reserved
Home | Company Info | Contact Us | Privacy policy | Term of use | Widget | Site map
Design by Herdiansyah . Published by Borneo Templates