Nov 14, 2010
Statoil lets contracts on two more fast-track projects
Statoil let a $90 million contract to Subsea 7 Ltd. for the engineering, procurement, construction, and installation of pipelines and control cables for connecting the PanPandora and Katla fast-track developments in the North Sea to existing production installations.
The contracts also cover installation of the subsea production system.
“The purpose of fast-track developments is to realize small finds that would generally not be profitable,” said Per Haaland, Statoil's head of the portfolio of fast-track developments on the Norwegian Continental Shelf.
[Read more]
Source: Penn Energy
Category:
Offshore and Energy
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment