Jan 19, 2011

Petrobras Completes Production Testing of Maruja-1 Exploration Well



Petrobras achieves an equipment constrained production test oil flow rate of 6142 stb/d through a 5/8 inch choke from the Maruja-1 Exploration Well during the clean-up flow period.
Karoon advises that production testing of the Maruja-1 exploration well is complete. Since the last report on 17 November 2010, the well was drilled to a total depth of 3789 metres and an extended well test was conducted over the interval 2201.5 and 2210 metres.
Source: Offshore Energy Today

0 comments:

Post a Comment

 
Copyright © 2011. Maritime Press Clipping . All Rights Reserved
Home | Company Info | Contact Us | Privacy policy | Term of use | Widget | Site map
Design by Herdiansyah . Published by Borneo Templates