
The alarm went off at 3:38 a.m. local time at the Snorre A platform due to a leak and production was shut down shortly before 4 a.m., Ola Anders Skauby, a spokesman for the Stavanger- based company, said by telephone today. While the situation was brought under control by 6 a.m. and the leak was stopped in an hour, Statoil doesn’t know when output can resume, Skauby said.
[Read more]
Source: Bloomberg
0 comments:
Post a Comment