Mar 5, 2012

Premier: Drilling Update – Anoa Deep




Premier Oil announces that the Lama formation within the Anoa field on Natuna Sea Block A has been successfully tested.
As per the announcement on 6 February 2012, the WL-5 development well on Natuna Sea Block A was deepened to a total depth of 11,012 feet to investigate the exploration potential of the Lama Formation within the Anoa Field. The well encountered approximately 300 feet of fractured Lama Sandstones.
The Lama formation has now been tested over the interval 10,658 feet MD to 10,770 feet MD and flowed gas at a rate of 17 mmscfd through a 48/64 inch choke. The results of the test will be integrated with the log and seismic data to determine the ultimate recoverable resource of this deeper reservoir that will be produced through the Anoa facility.
The West Callisto rig will move to drill the Biawak Besar prospect on Natuna Sea Block A. The results of this well are expected in April 2012.
Premier operates and holds a 28.667% interest in Natuna Sea Block A and is partnered by KUFPEC Indonesia (Natuna) BV, Hess and Petronas.

Source: Premier Oil

0 comments:

Post a Comment

 
Copyright © 2011. Maritime Press Clipping . All Rights Reserved
Home | Company Info | Contact Us | Privacy policy | Term of use | Widget | Site map
Design by Herdiansyah . Published by Borneo Templates