TotalEnergies has officially completed the Hai Long Offshore Wind Project, a 1.2 GW development off the coast of Taiwan, solidifying its position as a major player in Asia’s renewable energy transition.
The project, developed in partnership with Yushan Energy, combines fixed-bottom turbines and a floating demonstration platform, making it one of the most technologically diverse offshore wind farms in the region.
Despite challenging seabed conditions and typhoon risks, TotalEnergies applied its offshore engineering expertise — developed from decades of FPSO and deepwater oil projects — to successfully install all turbines on schedule.
The wind farm is expected to generate enough clean electricity to power 600,000 households, contributing directly to Taiwan’s goal of phasing out coal power by 2035.
0 comments:
Post a Comment