Jan 31, 2011
Balltec installs 16 SMCs for Total Pazflor FPSO
Balltec has just completed the supply and installation of 16 Permanent Subsea Mooring Connectors (SMC) for the Total Pazflor FPSO.
The facility is moored in approximately 3500 feet of water in Angola block 17. The connectors supplied by Balltec can be disconnected at any time during the design life of the facility should the need arise.
[Read more]
Source: Scandinavian Oil & Gas Magazine
Category:
Offshore and Energy
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment