Apr 21, 2011
GALAHAD–1 WELL TO COMMENCE DRILLING IN WA-363-P
Octanex N.L. (ASX Code: OXX) advises that the Galahad-1 well, the second well in the two well drilling campaign in the outer Exmouth Plateau permits WA-362-P and WA-363-P, is currently expected to spud within the next 5 to 7 days. Galahad-1 is located within WA-363-P, as shown on the following Well Location Map.
The well will take approximately 36 days and will be drilled using the Saipem 10000 drillship.
Source: Octanex
Category:
Offshore and Energy
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment