
RESOLVE Marine Group has successfully raised and refloated the “Machinist” drydock at Guam Shipyard in Apra Harbor, Guam. The 825 ft drydock sank on January 2, 2011 during a rough weather event. The salvage began on January 31 and successfully refloated the drydock on March 3.
[Read More]
Source: gCaptain
0 comments:
Post a Comment